L30 and L31 Related Documents and Links

Title Citation
Groundwater-Surface Water Interaction in Tree Islands: Water Conservation Area 3 Part 1: Phase 1 Well Installation Technical Publication WS-4. Bevier, C. and S. Krupa. 2001. Groundwater-Surface Water Interaction in Tree Islands: Water Conservation Area 3 Part 1: Phase 1 Well Installation Technical Publication WS-4. May 2001. South Florida Water Management District.
Data summary report groundwater flow and hydrology in vicinity of L31N Canal (Miami-Dade, Florida) during 2005-2011. Brock, J.T., B. Fitzgerald, and R.B. Susfalk. 2014. Data summary report groundwater flow and hydrology in vicinity of L31N Canal (Miami-Dade, Florida) during 2005-2011. Desert Research Institute, Reno, Nevada. Prepared for South Florida Water Management District. Purchase Order # 4500064939, West Palm Beach Florida.
Biscayne aquifer hydrology in the vicinity of west Miami-Dade County Florida water control structures during 2012-2014. Data Summary Report. Brock, J.T., D. Hire, B. Fitzgerald, R.B. Susfalk, and R. John. 2014. Biscayne aquifer hydrology in the vicinity of west Miami-Dade County Florida water control structures during 2012-2014. Data Summary Report. Desert Research Institute. USACE Contract No. W912HZ-12-C-0048
Resistivity Tracer Testing Report for the L-31N (L30) SMPP Baseline Hydrogeologic Testing Project Miami-Dade County, Florida. Cardno ENTRIX 2011. Resistivity Tracer Testing Report for the L-31N (L30) SMPP Baseline Hydrogeologic Testing Project Miami-Dade County, Florida USACE Contract No. W912EP-06-D-0015 Task Order 0006. October 2011. Prepared for US Army Corps of Engineers, Jacksonville, Florida.
Data Summary Report (2009 - 2011) L-31N (L-30) SMPP Baseline Hydrogeologic Testing Project Miami-Dade County, Florida. Cardno ENTRIX and Desert Research Institute. 2012. Data Summary Report (2009 - 2011) L-31N (L-30) SMPP Baseline Hydrogeologic Testing Project Miami-Dade County, Florida. USACE Contract No. W912EP-06-D-0015 Task Order 0006. January 18, 2012. Cardno ENTRIX File No.: 00061011.00
Hydrogeology and ground-water flow at Levee-31N, Miami-Dade County, Florida, July 2003 to May 2004.
External Link
Cunningham, K.J., M.A. Wacker, E. Robinson, C.J. Gefvert, and S.L. Krupa, 2004, Hydrogeology and ground-water flow at Levee-31N, Miami-Dade County, Florida, July 2003 to May 2004. U.S. Geological Survey Scientific Investigations Map I-2846, 1 sheet.
Multiple technologies applied to characterization of the porosity and permeability of the Biscayne aquifer, Florida.
External Link
Cunningham, K.J., and M.C. Sukop. 2011, Multiple technologies applied to characterization of the porosity and permeability of the Biscayne aquifer, Florida: U.S. Geological Survey Open-File Report 2011-1037, 8 pp.
Well Completion and Rehabilitation Report for the L-31N (L-30) SMPP Baseline Hydrogeologic Testing Project Miami-Dade County, Florida. ENTRIX 2010. Well Completion and Rehabilitation Report for the L-31N (L-30) SMPP Baseline Hydrogeologic Testing Project Miami-Dade County, Florida. USACE CONTRAC T NO. W912EP-06-D-0015 TASKORDER0006. JULY 2010. ENTRIX File No.: 00061011.00
Miami-Dade County Northwest Wellfield Groundwater Velocity Investigation. Krupa, S.L., S. Hill, and C. Bevier. 2001. Miami-Dade County Northwest Wellfield Groundwater Velocity Investigation. Technical Publication WS-1, South Florida Water Management District, West Palm Beach, Florida.
Quality Assurance Management for Hydrometeorological and Water Level Monitoring at SFWMD. SFWMD (2011) Quality Assurance Management for Hydrometeorological and Water Level Monitoring at the South Florida Water Management District Operations Control & Hydro Data Management Department Hydro Data Management Division Quality Assurance & Hydrology Section Procedure: Q200-001
QA/QC of Groundwater Level Data. SFWMD (2011) QA/QC of Groundwater Level Data. SCADA & Hydro Data Management Department Operations & Hydro Data Management Division ,Quality Assurance/Quality Control Section Procedure: Q205
Surveyor's Report: Specific Purpose Survey of Wells and Ground Elevations at Tree Island 3BS1,Miami-Dade County, Florida. Keith and Schnars. 2007. Surveyor's Report: Specific Purpose Survey of Wells and Ground Elevations at Tree Island 3BS1,Miami-Dade County, Florida. Keith and Schnars project number 16434.00, Task 22160. Report Date: September 26, 2007. Prepared for: South Florida Water Management District.
Surveyor's Report: Specific Purpose Survey of the Stilling Well(s) L31NN Site, Dade County, Florida. Keith and Schnars. 2006. Surveyor's Report: Specific Purpose Survey of the Stilling Well(s) L31NN Site, Dade County, Florida. Keith and Schnars project number 16434.00, Task 22164 Report Date: October 14, 2006. Prepared for: South Florida Water Management District.
Surveyor's Report: Specific Purpose Survey of the Stilling Well(s) L31NS Site. Dade County, Florida. Keith and Schnars. 2006. Surveyor's Report: Specific Purpose Survey of the Stilling Well(s) L31NS Site. Dade County, Florida. Keith and Schnars project number 16434.00, Task 22164 Report Date: October 14, 2006. Prepared for: South Florida Water Management District.
L-31N Seepage canal monitoring wells & core borings. Comprehensive Everglades Restoration Plan, Miani-Dade Florida. Weidener Surveying and Mapping. 2005. L-31N Seepage canal monitoring wells & core borings. Comprehensive Everglades Restoration Plan, Miani-Dade Florida. Prepared for: South Florida Water Management District. 9 Sheets.